1·The construction period lasted ten years.
建设周期跨越十个年头。
2·This method can decrease the construction period.
采用该法可以节省工期。
3·The project construction period is expected to 8 months.
该项目建设期预计为8个月。
4·To ensure total construction period to meet 595 calendar days.
确保工程总工期目标:595个日历天。
5·High speed of construction can shorten the construction period.
施工速度快,有利缩短建设周期。
6·Construction Period: usually 12 months, no more than 18 months in principle.
建设周期:一般为12个月,原则上不超过18个月。
7·Structure safety and reliability are firmly required during construction period.
施工期间对结构的安全性和可靠性有着严格的要求。
8·It reduces construction period of 30%, economic and social benefit is very good.
工期缩短了30%,经济及社会效益十分显著。
9·The southern region with rainy season, leakage problems in the construction period.
南方地区正处雨季,建筑渗漏问题进入年度高发期。
10·The original construction program is scheduled to project construction period is 3 years.
原来的建设项目,预计项目建设期为3年。